Projects // Commercial // Cobalt Plot 4A and 9C

Location                 Cobalt Business Park, Newcastle Upon Tyne

Client                      Highbridge Properties

Main Contractor     Bowmer and Kirkland

Value                       £4M

 

Scope of Works

The work consisted of Mechanical and Electrical installations to a various speculative office space totalling in excess of 150,000sqft, over a range of 3 to 4 story office blocks. Mechanically the scheme was composed of a VRF air conditioning system, fresh air ventilation/toilet supply and extract and domestic/drainage services to the core areas. The system also consisted of a number of low carbon and sustainable solutions such as rain water harvesting and solar hot water. Electrically the scheme consisted generally of underfloor small power, fire alarms, disabled refuge/intercom systems, lighting to offices and cores and full car park lighting.

 

Key Points

  • BREEAM ‘very good’
  • Part L assessment carried out by Castle Building Services
  • Energy Performance Rating
  • Negotiated Cat B fit outs