Projects // Leisure & Retail // Radisson Blu

Location Manchester Airport

Client Rezidor

Main Contractor Thomas Johnstone Limited

Client Consultant Hurley Palmer Flatt

Value £1250K

 

Scope of Works
Refurbishment of mechanical and electrical works to level 8 and 9 bedroom wings of existing Hotel with re-model of reception area and bar/lounge level.

 

Key Points

  • Phased construction and handover of individual floor “wings” and Function areas.
  • Hotel was maintained and operational throughout the works.
  • Structural commissioning activities sequenced to dedicated phases of the works.
  • Continuity of existing systems throughout the works
  • 104 bedrooms.